Installation
For most privacy screens installation is a two-step process.
Step 1 - Mounting Points
The mounting points are installed on the existing structure. Dimensions are taken and the panel is ordered; fabrication takes between one and two weeks.
Step 2 - Panel Installation
The panel is then ready to be installed at your earliest possible convenience; this takes one day.
Features
- Ozone Shadecloth 100% monofilament
- Double stitched seams
- ‘Ezy Slide’ tensioning system
- Stainless steel edge cable
- Reinforced corner detail
- Stainless steel hardware and fittings