Alfresco Shade Sails - Technical Information
Installation
Installation is a two-step process.
Step 1 - Foundations
All mounting points are installed, including
- Hole boring and concreting in poles
- Wall brackets
- Roof mounts
A string line is run from point to point in place of the proposed sail. The string line is moved (higher or lower) at each point untill a final sail position is chosen. This process takes one day.
Dimensions are taken and the sail is fabricated; fabrication takes between one and two weeks.
Step 2 - Sail Installation
Once fabricated the sail can be installed at your earliest possible convenience; this takes one day.
Shade Sail
- Ozone Shadecloth 100% monofilament
- Double stitched seams
- ‘Ezy Slide’ tensioning system
- Stainless steel edge cable
- Reinforced corner detail
- Stainless steel hardware and fittings
Waterproof Sail
- Mehler Fr700 & Fr900 Structural PVC fabrics
- High frequency and hot wedge welded
- Reinforced corner detail
- Stainless steel hardware and fittings
Footings and Poles
- Concrete footings, 450mm diameter 1.5m deep
- Galvanised steel poles
- Poles painted onsite to a colour of your choice